Geosynthetic Cementitious Composite Mat (GCCM) (Needle-punctured Rubber-coated Type), also known as concrete canvas is a new engineering material combining cementitious materials with needle-punched fiber reinforcement. It adopts a needle-punched nonwoven process, filled with a specially formulated dry cement mix, and features a composite waterproof backing (adhesive coating layer + PE film) on the bottom. Upon hydration, it hardens into a waterproof, fire-resistant, and durable concrete layer.
NuoKun manufactures concrete canvas in a range of 6–25kg/m². For mining drainage projects, 12kg/m² concrete canvas is wort considering.
| Item | Value |
| Compressive strength (28days) | 32.4MPa |
| Peel Strength | ≥1000N/m |
| Impact Resistence | No visible cracks or damage |
| Tensile strength | 2.9MPa |
| Abrasion Resistance | 360mm2 |
| Aging Resistance | No visible cracks, spalling or pulverization |
Mining operations often involve large areas of exposed soil, steep slopes, changing terrain, and drainage systems that must handle surface runoff and process-related water. Without proper lining protection, continuous water flow can cause soil erosion, channel deterioration, sediment accumulation, and maintenance problems. The 12kg/㎡ GCCM provides a durable cementitious lining solution for protecting these drainage structures.
1. Protecting Mining Drainage Channels
Drainage channels around mining sites are frequently exposed to flowing rainwater, sediment, and abrasive particles. Unprotected soil channels can gradually erode, leading to channel deformation and reduced drainage efficiency. GCCM forms a hardened cementitious surface that protects channel beds and side slopes against water erosion. It is suitable for lining surface drainage ditches, roadside drainage channels, and water diversion channels.
2. Controlling Soil Erosion on Mining Slopes
Mining sites often have exposed embankments and slopes where concentrated rainfall runoff can wash away surface soil. When properly installed and anchored, GCCM creates a protective surface layer that reduces erosion caused by flowing water. Its flexible roll format also makes it easier to transport and position on irregular terrain compared with conventional concrete construction.
3. Improving Water Conveyance Efficiency
Sediment accumulation and surface deterioration can affect the performance of unlined drainage channels. The relatively smooth cementitious lining formed by GCCM provides a more stable water-conveyance surface, reducing direct contact between flowing water and exposed soil.
4. Reducing Construction Time and Maintenance Requirements
GCCM is delivered in rolls and does not require on-site concrete mixing. Workers can unroll, position, cut, overlap, anchor, and hydrate the material to meet the installation design. Its rapid curing characteristics and erosion-resistant cementitious surface reduce construction downtime and the need for frequent channel repairs.



Mining operations in Indonesia often face challenging drainage conditions, particularly in areas with heavy seasonal rainfall, exposed soil, and uneven terrain. Mining drainage channels can experience continuous water flow, soil erosion, sediment accumulation, and damage to unprotected channel surfaces. Traditional concrete lining may also require considerable labor, mixing equipment, transportation, and construction time, making installation more complicated in remote mining areas. For mining contractors, finding a durable, waterproof, and easy-to-install drainage lining material is essential to maintaining efficient water management and protecting surrounding soil.
To address these challenges, a 12kg/㎡ concrete canvas can be used as a protective lining solution for mining drainage channels, water diversion ditches, and erosion-prone slopes. Unlike conventional concrete, GCCM is supplied in rolls and does not require on-site concrete mixing. Workers can unroll, cut, position, and secure the material using U-shaped or L-shaped fixing pins before applying water for hydration. Its fiber-reinforced cementitious structure forms a hardened protective layer, while the PE backing provides a waterproof barrier.
Two months after installation, concrete canvas provides both surface protection and waterproofing for mining drainage systems in Indonesia. It forms a hardened cementitious layer that protects drainage channels and surrounding slopes against water erosion and surface damage. Meanwhile, the integrated PE backing acts as a waterproof barrier, preventing water from seeping into the underlying soil. This combination of erosion protection and seepage control maintains drainage channel stability, reduces water infiltration, and protects the surrounding ground.
Q1: What fixing accessories can be used to secure GCCM?
GCCM can be secured using U-shaped or L-shaped fixing pins. The most commonly used size is 3.5 mm × 20 cm. However, the appropriate pin type and size should be selected to meet the thickness of the GCCM.
Q2: What is 12kg/㎡ GCCM used for in mining drainage projects?
12kg/㎡ GCCM is mainly used as a protective cementitious lining for mining drainage channels, stormwater ditches, water diversion channels, and erosion-prone slopes. It protects exposed soil surfaces from flowing water and reduces channel erosion.
Q3: How quickly does GCCM harden?
Under suitable curing conditions, GCCM can reach approximately 80% of its specified strength within 24 hours. But actual curing and strength development depend on hydration, temperature, moisture, and product specifications.
Q4: What is the weight and price of a 12kg/㎡ GCCM roll?
One roll measures 2m × 25m. The total weight is 600kg per roll, and the price is USD 810 per roll.
leave a message